Hydropower
Producing Clean Energy
Inside the Hydropower Network
-
Ownership
The U.S. Bureau of Reclamation owns and operates the original six hydropower plants associated with the C-BT Project. Northern Water added two additional hydropower facilities: the Robert V. Trout Hydropower Plant at Carter Lake in 2012; and the Granby Hydropower Plant at Lake Granby in 2016. The Trout Hydropower Plant was the first project in the region to receive a Lease of Power Privilege from Reclamation, granting the ability to pursue hydro on the federally-owned facility.
-
Locations
Six of the C-BT Project’s eight power plants are located on the East Slope. The two West Slope power plants include Green Mountain Power Plant at Green Mountain Reservoir on the Blue River near Kremmling, and the Granby Hydropower Plant at the base of Lake Granby Dam.
-
Meeting Peak Power Needs
The C-BT Project's East Slope power plants supply power for peak electrical demands by using a system of forebays, afterbays and penstocks. When peak electrical power is needed, water is moved from a plant's forebay (a small reservoir above a hydroelectric power plant) into a penstock leading to the power plant. The force of the water moving through the penstock and turbine generates electricity. After passing through the turbine, the water is typically released into an afterbay (a small reservoir located below a hydroelectric power plant).
-
Powering the Pump Plants
When the C-BT Project was planned in the 1930s, the power plants at Lake Estes and Green Mountain Reservoir were designed to provide power to the Farr and Willow Creek pump plants. This was largely due to insufficient electrical infrastructure and power production on the West Slope when the project was built.
Electricity from the Lake Estes Power Plant reaches the Farr and Willow Creek plants via a 69,000-volt transmission line extending through the Adams Tunnel beneath Rocky Mountain National Park. Today, even with adequate West Slope electrical infrastructure and power projection, the Adams Tunnel transmission line still provides the West Slope pump plants with a portion of their electrical needs.
The West Slope pump plants at Farr and Willow Creek annually use 70 million kilowatt-hours, with the remaining 700 million kilowatt-hours sold to customers in Colorado, Eastern Wyoming, Kansas and Western Nebraska.